[DEMO] Offshore Chemical Injection Skid CI-200
Imaginary Offshore Ltd. — bid due 2026-11-20
Approval workflow
- Fictional demonstration projects cannot be approved for external bidding
Fictional sample. 6.0 × 3.2 m skid base with lifting padeyes, drip tray and piping supports. Offshore C5 coating.
Scope parameters
Model data
Technical codes & standards — contract applicability register
These are suggested code references, not certified requirements. Confirm each code, edition, scope and client deviation against the signed tender documents. Decisions are locally saved with this project; no engineering certification is implied.
Welding procedure/personnel qualification for applicable ASME equipment and piping
Process piping design/fabrication where included in scope
Structural steel specification where AISC governs
Execution requirements where EN structural steel system governs
Welding of steel structures where required by contract
Fusion welding quality requirements when adopted by the contract
Corrosion protection by protective paint systems where specified
Material inspection document requirements, subject to approved specifications
IFC data exchange; not a manufacturing acceptance standard
Material specifications, permissible stresses and properties referenced by the applicable construction code
Nondestructive examination methods where the construction code and contract require them
Code of Standard Practice for steel buildings and bridges: tolerances, fabrication and erection practice
Welding procedure qualification by procedure test where ISO qualification governs the WPS/PQR
Qualification testing of welders for fusion welding of steels where ISO qualification governs
Qualification and certification of NDT personnel where inspection is contractually required
Scenarios
Scenario Lab| Scenario | Cost | Price | Hours | Weeks |
|---|---|---|---|---|
| Base | AED 101,714 | AED 119,663 | 388 | 0.5 |
| Efficient | AED 94,905 | AED 111,653 | 341 | 0.4 |
| Conservative | AED 113,763 | AED 133,839 | 452 | 0.8 |
Assumptions register
Report- ASSUMEDPipe support welds assumed — supports not detailed in model
- ASSUMEDAngle paint area estimated from weight (no surface data)