Integrated engineering workflow

Engineering Workspace

One path from project selection to controlled job cards. Every figure below comes from the existing calculation engines.

Connection library
Connections
14
5 configuration(s)
Calculated
1/1
0 awaiting check
Man-hours
16.78
Current calculations
Machine hours
4.52
Not replaceable by labour
Elapsed
—
No card scheduled
Checked cards
0
0 draft(s)
Next step · Connection analysis Requires engineering verification

14 connection(s) resolve to 5 configuration(s); 1 need engineering data.

Job cards and revisions

Generate in library
No job card issued

Generate connection, assembly or batch cards from checked calculations in the connection library.

Hours variance — original, revised and actual

No job card has been issued, so there is no variance to show.

Original is the first issued revision; revised is the latest revision. Both include an additive access allowance. Actual hours are entered by the planner from the fabrication record — FABRIX has no clocking integration and never fills a missing actual with zero.

Project phase actuals
PhasePlanned hActual hΔNote
Material procurement12096-2480% of planned (under)
Cutting & rolling720540-18075% of planned (under)
Fit-up & welding2,9001,200-1,70041% of planned (under)
NDT & PWHT3800-380No actual recorded for this phase
Hydrotest & coating6000-600No actual recorded for this phase

Phase actuals are project-level figures edited in Planning; they are not allocated to individual cards.