Estimator
Integrated engineering workflow
Engineering Workspace
One path from project selection to controlled job cards. Every figure below comes from the existing calculation engines.
Connections
14
5 configuration(s)
Calculated
1/1
0 awaiting check
Man-hours
16.78
Current calculations
Machine hours
4.52
Not replaceable by labour
Elapsed
—
No card scheduled
Checked cards
0
0 draft(s)
Next step · Connection analysis Requires engineering verification
14 connection(s) resolve to 5 configuration(s); 1 need engineering data.
Project & engineering data
Manage projectsClient
Fictional Petroleum Co.
Type
Pressure Vessel
Due
2026-11-25
Approval
In Review
Parts
7 row(s)
Tender welds
5
Deck rows
0
Demonstration data. Rates, clients and volumes are sample values, not company-approved figures.
Assembly explorer
| Assembly | Connections | Profiles | Revision |
|---|---|---|---|
| A-101 | 2 | IPE 220 | A |
| A-102 | 2 | IPE 220 | A |
| A-103 | 2 | IPE 220 | A |
| A-104 | 2 | IPE 220 | A |
| A-105 | 2 | IPE 220 | A |
| A-201 | 1 | IPE 240 | A |
| A-202 | 1 | IPE 220 | A |
| A-203 | 1 | IPE 220 | A |
| A-204 | 1 | IPE 220 | A |